Entries by paul

HIGH LEVEL BRIDGE GANTRIES

      Lift-Rite have been back to the High Level Bridge in Gateshead (one of the seven magnificent bridges over the Tyne) to carry out load testing of the maintenance access gantries to BS 6037-2, which are located under each of the six spans. Logistically challenging, we used ‘sausage’ water bags to apply the […]

900t SPREADER BEAM

         Lift-Rite recently supplied a 900t spreader beam to Seaway 7 for use in their offshore renewable campaigns.  The beam was fully designed, fabricated and tested by Lift-Rite and is the biggest beam we’ve ever supplied.   Bespoke lifting projects are primary focus, get in touch to see how we can support […]

Access Tower Completion

        Lift-Rite are pleased to have recently completed a modular access tower system in collaboration with our sister company, Tyne Gangway.  The structure was fully designed in house, steel fabrication was completed by Lift-Rite and the aluminium sections fabricated by Tyne Gangway.  Lift-Rite then carried out all trial fit assembly, load testing […]