Lift project on the River Tyne

Lift-rite recently completed a contract lift project for work on the River Tyne.

Our work scope was from initial site surveys, Lift planning through to completion of the heavy lift.

A 110 Tonne Ampelmann gangway system was lifted from a vessel and placed onto the hard standing quay area for works to be carried out on the gangway.

On completion of the required work to the gangway, Lift-rite lifted the gangway onboard another vessel using a 1000 Tonne mobile crane.

Once the gangway was installed, Lift-rite carried out load testing of the gangway to ensure its safety prior to use.

Work was completed safely and on time within budget for our client.

[av_horizontal_gallery ids=’10016,10015′ height=’40’ size=’portfolio’ links=’active’ lightbox_text=’no_text’ link_dest=” gap=’large’ active=” initial=” control_layout=’av-control-default’ id=” av_uid=’av-p9wzw7′ custom_class=”]

Blyth Offshore

Lift-rite have the ability to manage your mobilisation / de-mobilisation projects from start to finish with a 120 tonne capacity crane on our quay to complete your heavy lifts.

Our rigging team are on hand 24/7 to ensure that your work is completed safely and on time.